- SAP PS Tutorial
- SAP PS - Home
- SAP PS - Overview
- Integration with ERP Modules
- Organization Structure Elements
- SAP PS - Currencies
- SAP PS - What is a Project?
- SAP PS - Defining Special Characters
- SAP PS - Status Profile
- SAP PS - Selection Profile
- SAP PS - Project Profile
- SAP PS - Settlement Profile
- SAP PS - Network Profile
- SAP PS - Network Type
- Person Responsible for Work Center
- Maintain Activity Control Key
- SAP PS - Access Control List
- SAP PS - Cost Component
- SAP PS - Execution Service Profile
- SAP PS - Budget Management
- Number Ranges for Budgeting
- SAP PS - Revenues and Earnings
- SAP PS - Dates
- WBS Scheduling Parameters
- SAP PS - Material
- SAP PS - Versions
- SAP PS - Project Information System
- SAP PS - Consultant Responsibilities
- SAP PS - Useful Resources
- SAP PS - Questions & Answers
- SAP PS - Quick Guide
- SAP PS - Useful Resources
- SAP PS - Discussion
SAP PS Mock Test
This section presents you various set of Mock Tests related to SAP PS. You can download these sample mock tests at your local machine and solve offline at your convenience. Every mock test is supplied with a mock test key to let you verify the final score and grade yourself.
SAP PS Mock Test III
Q 1 - Which of the following defines perquisite for distributing work to HR resources?
A - Assigned labor capacity to work center.
B - Assigned work center to internally processed activities.
Answer : B
Q 2 - Up to 9999 can be created with reference to material requirement in Project System?
Answer : A
Q 3 - In SAP Project System, if you require more than 9999 components in one network then you may use subnetworks?
Answer : A
Q 4 - Which of the following is correct about Network profiles in SAP system?
A - To maintain Network and WBS structure and to define rules for linking networks.
B - To determine whether settlement is required, allowed or blocked.
C - To maintain default values and control parameters like planning methods for costs.
Answer : A
Q 5 - You should change the keys related to costing sheet or the results analysis key as these can’t change existing system?
Answer : B
Q 6 - The information entered in project profile is copied to project in project definition or also in the project elements and can be changed at later stage?
Answer : A
Q 7 - Which of the following is used to control that the project does not run over allocated budget?
A - Using Availability Control by defining tolerance limits
Answer : A
Q 8 - While defining a project profile in SAP system, which of the following is represented by Proj.prof?
A - Category to which project belongs
B - How the project will be identified in project builder
C - Enter the unique ID that identifies project profile in SAP system
Answer : C
Q 9 - Where do you control the budget for the project in SAP PS system?
Answer : D
Q 10 - In PS system, you can use the settlement profile to define the following for actual costs?
Answer : D
Explanation
You use the settlement profile to define the following for actual costs:
- Full Settlement
- Can be settled
- Not to be settled
Q 11 - Which of the following Transaction Code is used to create Budget profile?
Answer : A
Q 12 - Time period in which you want to control your project, and it will be displayed in your planning board is known as?
Answer : B
Q 13 - In SAP system, performing self-defined checks for master data fields of the same elements is called?
Answer : B
Answer Sheet
Question Number | Answer Key |
---|---|
1 | B |
2 | A |
3 | A |
4 | A |
5 | B |
6 | A |
7 | A |
8 | C |
9 | D |
10 | D |
11 | A |
12 | B |
13 | B |