Here is a list of sample questions which would help you to understand the pattern of questions on Project Risk Management being asked in PMP Certification Exams.

You can check our complete set of PMP Mock Exams:


(1) PMI states that there are two risk types : business and insurable. Which of the following are considered insurable risks?

  1. Employee replacement costs

  2. Opportunity costs

  3. Sunken costs

  4. Damage caused by a bonded contractor

  5. A and D

Answer:F

(2) The Three attributes of project risk are _________, ___________ and ___________.

  1. What might happen, who it happens to, and how much will it cost

  2. Notification, frequency of relevant events, probability of occurrence

  3. Risk cost, quality, control

  4. Quality, risk planning, total number of risk events

  5. Risk event, probability occurrence, the amount at stake

Answer: E

(3) A risk is defined as what might happened to the ____________ of the project

  1. assessment

  2. detriment

  3. schedule

  4. cost

  5. scope

Answer: B

(4) When is the project's amount at stake the lowest

  1. conceptual

  2. design

  3. close-out

  4. implementation

Answer:A

(5) A new project was initiated that involves new technology and subsequently has never been done before. What type of contract would to owner want to issue to reduce or eliminate as much risk as possible.

  1. Firm fixed price

  2. Cost plus fix fee

  3. Cost plus incentive fee

  4. Lump sum

  5. A and D

Answer:E

(6) What is the most accurate method of obtaining project information that can reduce the amount of risk?

  1. Observations on the current project

  2. Determining the risk by using brainstorming techniques

  3. The use of historical data from previous projects that were similar in nature

  4. Sensitivity analysis

  5. Delphi technique.

Answer: C

(7) Which of the following fit the category of external risks?

  1. Project delays, budget under-runs, movement of city utilities

  2. Regulatory, currency changes, taxation

  3. Natural disasters, regulatory, design

  4. Inflation, design, social impact

  5. Political unrest, budget overruns, size and complexity of the project

Answer: B

(8) Decision trees are best used for :

  1. Determining the interaction of the amount at stake and the expected value

  2. Association of the probabilities with the risk events

  3. An illustration of how to see the interactions between decisions and the associated events

  4. A flow chart which determines the standard deviation of the risk event

Answer: C

(9) The total amount of risk that is calculated for a project is found by

  1. Multiplying the sum of each the risk times the amount at stake

  2. Calculating the cumulative sum of the probability for each risk and multiplying this value times the consequence of occurrence of the risk events

  3. Cannot be calculated since all risks are not know

  4. The amount of project reserves available

Answer: B

(10) A situation in which one of two or more risk events will follow an act, but the precise nature of these events may not be known and the probabilities of their occurring cannot be objectively assigned, is the definition of

  1. certainty

  2. uncertainty

  3. risk

  4. risk adversity

  5. None of the above.

Answer: B