SAP QM Online Quiz



Following quiz provides Multiple Choice Questions (MCQs) related to SAP QM. You will have to read all the given answers and click over the correct answer. If you are not sure about the answer then you can check the answer using Show Answer button. You can use Next Quiz button to check new set of questions in the quiz.

Questions and Answers

Q 1 - Under quality control, you have quality notifications, standard reports and Quality notification system. What actions has to be taken as per defect finding?

A - True

B - False

Answer : A

Q 2 - You can assign an inspection method to master inspection charactertics or directly to an inspection charactertics in an inspection plan?

A - True

B - False

Answer : A

Explanation

You can use inspection method to perform the inspection. An inspection method can be assigned to master inspection charactertics or directly to an inspection charactertics in an inspection plan.

An Inspection method can be created in one plant same method can be used in other plant.

Q 3 - In SAP system, Quality Management data is primarily maintained at the?

A - Cost Centre level

B - Plant level

C - Company code level

D - Sales Organization level

Answer : B

Q 5 - Sampling procedures are usually used at characteristic level of a task list or material specification. However you can also determine the sample size without reference to task lists?

A - True

B - False

Answer : A

Q 7 - What is SAP inspection type used for final lot inspection?

A - 01

B - 02

C - 03

D - 04

Answer : D

Q 8 - For costing and to decide how many goods are accepted, SAP QM is directly linked to?

A - SAP MM

B - SAP PP

C - Controlling

D - SAP Plant Maintenance

Answer : C

Explanation

SAP QM is directed linked to controlling for costing and to decide how many goods are accepted. You update the vendor quality record in the system and this helps to find out if same vendor should continue to supply the material or there is a need to find a new source.

Q 9 - As part of Quality Management process, which of the following parameter can be set for Material master?

A - Material Requirement Planning run

B - Material Type

C - Purchase Order

D - Inspection Method & Sample Procedure

Answer : D

Q 10 - In a Sampling scheme, variable inspections include −

A - K-Factor

B - Sample Size

C - Both

D - None of the above

Answer : C

Explanation

The sample size, acceptance number, and rejection number for attributive inspections and sample size and K-factor for variable inspections.