SAP QM - Lot Inspection


Advertisements

In SAP system, you can perform the incoming inspection for different material like raw material inspection, in progress material inspection or final goods inspection. Goods receipt is generated as a part of purchasing or against a scheduling agreement.

For each good receipt, SAP system creates a one-inspection lot, which contains details such as vendor, date or purchase, etc.

Step 1 − To post goods receipt against PO, use T-Code: MIGO

Step 2 − In the next window, enter the following details as shown in the screenshot.

  • Select Goods receipt from the drop-down list.
  • Select Purchase order from the drop-down list.
  • Enter purchase order number.
Hanauser

Step 3 − Click the tick button to go to next screen.

Quality Inspection

You can see the stock type as Quality Inspection is generated automatically as the material is subjected to quality inspection. To save the document, click the save button at the top.

Useful Video Courses


Video

SAPUI5 Online Training

25 Lectures 6 hours

Sanjo Thomas

Video

SAP Webi Online Training

26 Lectures 2 hours

Neha Gupta

Video

SAP Basis Online Training

30 Lectures 2.5 hours

Sumit Agarwal

Video

SAP C4C Online Training

30 Lectures 4 hours

Sumit Agarwal

Video

SAP MM Online Training

Most Popular

14 Lectures 1.5 hours

Neha Malik

Video

SAP WM Online Training

13 Lectures 1.5 hours

Neha Malik

Advertisements