
- SAP PP - Home
- SAP PP - Introduction
- SAP PP - Common Tables
- SAP PP - Organization Structure
- Integration with Other Modules
- SAP PP - Master Data
- SAP PP - Bill of Materials
- SAP PP - Work Center
- SAP PP - Routing
- SAP PP - Demand Management
- SAP PP - Creating PIR
- Material Requirement Planning
- SAP PP - MRP List
- SAP PP - Long Term Planning
- SAP PP - Production Orders
- SAP PP - Production Order Change
- Production Order Confirmation
- Canceling Production Order
- SAP PP - Capacity Planning
- SAP PP - Capacity Leveling
- SAP PP - Goods Receipt
- SAP PP - Stock Overview
- SAP PP - Goods Issue
- SAP PP - Goods Issue Reversal
- SAP PP - Lean Manufacturing
- SAP PP - Reports
- SAP PP - Material Document List
- Stock of Multiple Materials
- List in Bill of Material
SAP PP Online Quiz
Following quiz provides Multiple Choice Questions (MCQs) related to SAP PP. You will have to read all the given answers and click over the correct answer. If you are not sure about the answer then you can check the answer using Show Answer button. You can use Next Quiz button to check new set of questions in the quiz.

Q 1 - In Material Requirement Planning, which of the following table contains document header data?
Answer : A
Explanation
MDKP Document Header data
MDTB Table Structure
MDVM Planning File Details
MDFD MRP Date details
Q 2 - In SAP PP, which of the following object is at the top in an Organization structure?
Answer : B
Explanation
In SAP PP module, organization structure defined the location of manufacturing plants and storage locations within the plant. At the top you have company and company code and then each company code contains different plant and storage locations.
Answer : A
Q 4 - When you use Planning strategy 10, which of the following is correct?
A - Only PIR quantity is considered for MRP run & PIR requirement type is VSF.
B - Sales order are completely ignored.
C - For MRP run maximum of 2 PIR and Sales order can be considered
Answer : A
Explanation
When you use Planning strategy 10, only PIR quantity is considered for MRP run and sales order are completely ignored. In this PIR requirement type LSF and is reduced when you deliver stock to customer.
Q 5 - After MRP run, which of the following gets created in Planning?
Answer : A
Q 6 - In Long Term Planning, to create an inactive version of Planned Independent requirement PIR what is version type?
Answer : B
Q 7 - In which of MRP type, system consider all the material irrespective of changes and it is time consuming and not common in Production planning?
Answer : C
Explanation
NetChange
In this run system consider those material which has undergone some changes from the previous MRP run.
NetChange in planning horizon
This run considers the requirement in predefined planning horizon and not like net change which check the future requirements.
In this run, system consider only those material which has undergone some changes from their last MRP run.
Regenerative Planning
In this run, system consider all the material irrespective of changes and it is time consuming and not common in Production planning.
Q 8 - When raw material is consumed to produce material as per Production order, to perform goods issue movement type is?
Answer : C
Explanation
In SAP PP, goods issue is done when raw material is consumed to produce material as per Production order. When goods are issued, system decreases the inventory of components at the storage location in Production Planning system.
Movement type 261 is used for goods issue.
Q 9 - Which of the following is correct about regenerative planning and net change planning?
A - Planning is performed online however in NETCH it is performed as background job.
B - Planning of material is as per demand, in other one it is based on previous productions.
Answer : C
Q 10 - To set your PIR version active, which of the below value should be used to specify requirement would be considered in material requirement planning?
Answer : A
Explanation
In SAP PP, demand management is performed by Planned Independent requirement PIR. Planned Independent requirement provides input for production planning. A PIR contains one planned quantity of product and one date for material or a planned quantity is split over a span of time period.
To set your PIR version active use value 00 to specify requirement would be considered in material requirement planning. To maintain number of versions of planned independent requirement, you can set some numbers to active and others to inactive.