- Data Structure
- Networking
- RDBMS
- Operating System
- Java
- MS Excel
- iOS
- HTML
- CSS
- Android
- Python
- C Programming
- C++
- C#
- MongoDB
- MySQL
- Javascript
- PHP
- Physics
- Chemistry
- Biology
- Mathematics
- English
- Economics
- Psychology
- Social Studies
- Fashion Studies
- Legal Studies
- Selected Reading
- UPSC IAS Exams Notes
- Developer's Best Practices
- Questions and Answers
- Effective Resume Writing
- HR Interview Questions
- Computer Glossary
- Who is Who
LocalDateTime plusWeeks() method in Java
An immutable copy of a LocalDateTime object where some weeks are added to it can be obtained using the plusWeeks() method in the LocalDateTime class in Java. This method requires a single parameter i.e. the number of weeks to be added and it returns the LocalDateTime object with the added weeks.
A program that demonstrates this is given as follows −
Example
import java.time.*; public class Demo { public static void main(String[] args) { LocalDateTime ldt = LocalDateTime.now(); System.out.println("The current LocalDateTime is: " + ldt); System.out.println("The LocalDateTime with 4 weeks added is: " + ldt.plusWeeks(4)); } }
Output
The current LocalDateTime is: 2019-02-18T10:23:47.908 The LocalDateTime with 4 weeks added is: 2019-03-18T10:23:47.908
Now let us understand the above program.
First the current LocalDateTime is displayed. Then an immutable copy of the LocalDateTime where 4 weeks are added is obtained using the plusWeeks() method and this is displayed. A code snippet that demonstrates this is as follows −
LocalDateTime ldt = LocalDateTime.now(); System.out.println("The current LocalDateTime is: " + ldt); System.out.println("The LocalDateTime with 4 weeks added is: " + ldt.plusWeeks(4));
Advertisements