- SAP QM Tutorial
- SAP QM - Home
- SAP QM - Overview
- SAP QM - Components
- SAP QM - Integration
- SAP QM - Master Data
- SAP QM - Inspection Methods
- SAP QM - Sampling
- SAP QM - Inspection Plan
- SAP QM - Quality Info Records
- SAP QM - Lot Inspection
- SAP QM - Result Recording
- SAP QM - Usage Decision
- SAP QM - Listing Inspection Lot
- SAP QM - In-Process Inspection
- SAP QM - Final Inspection
- SAP QM - Defects Recording
- SAP QM - Quality Notification
- SAP QM - Benefits
- SAP QM - Tables
- Consultant Responsibilities
- SAP QM Useful Resources
- SAP QM - Questions Answers
- SAP QM - Quick Guide
- SAP QM - Useful Resources
- SAP QM - Discussion
SAP QM Online Quiz
Following quiz provides Multiple Choice Questions (MCQs) related to SAP QM. You will have to read all the given answers and click over the correct answer. If you are not sure about the answer then you can check the answer using Show Answer button. You can use Next Quiz button to check new set of questions in the quiz.
Q 1 - In which of the following QM component, someone from the quality department inspects an item as per defined points in inspection plan?
Answer : B
Explanation
Under Quality assurance, it includes the quality inspection.
A Quality inspection involves someone from the quality department inspects an item as per defined points in inspection plan. You perform the inspection based on one or more inspection lots, where a lot is a request to inspect a specific item.
Q 2 - Which of the following is not a control parameter that can be set on the material master for Quality Management?
Answer : A
Q 3 - When you change Master inspection characteristics MIC and/or Inspection methods with history, which of the following is/are true?
Answer : D
Q 4 - Which of the following is a charactertics of quality control chart type?
A - The characteristics for which the control chart is suited
B - The control variables a chart contains
Answer : D
Q 5 - Sampling procedures are usually used at characteristic level of a task list or material specification. However you can also determine the sample size without reference to task lists?
Answer : A
Q 6 - Which of the following Transaction code is used to create an Inspection Plan?
Answer : D
Q 7 - Which of the following Transaction is used to create a usage decision against inspection lot?
Answer : A
Q 8 - To release and complete quality notification in SAP system, which of the following T-code is used?
Answer : B
Explanation
To release and complete quality notification in SAP system, use T-Code: QM02
Q 9 - As part of Quality Management process, which of the following parameter can be set for Material master?
Answer : D
Q 10 - In a Quality Info Record, it is possible to that inspection is required when it is procured from vendor A and is not required if you procure from Vendor B?