java.time.Period.plusDays() Method Example



Description

The java.time.Period.plusDays(long daysToAdd) method returns a copy of this Period with the specified Period in standard 24 hour days added.

Declaration

Following is the declaration for java.time.Period.plusDays(long daysToAdd) method.

public Period plusDays(long daysToAdd)

Parameters

daysToAdd − the days to add, positive or negative.

Return Value

a Period based on this Period with the specified days added, not null.

Exception

ArithmeticException − if numeric overflow occurs.

Example

The following example shows the usage of java.time.Period.plusDays(long daysToAdd) method.

package com.tutorialspoint;

import java.time.Period;

public class PeriodDemo {
   public static void main(String[] args) {

      Period period = Period.ofDays(2);
      Period period1 = period.plusDays(1);
      System.out.println(period1.getDays());   
   }
}

Let us compile and run the above program, this will produce the following result −

3
Advertisements