- SAP SCM Tutorial
- SAP SCM - Home
- SAP SCM - Overview
- SAP SCM - Components
- SAP SCM - Benefits
- SAP SCM - Demand Management
- SAP SCM - Creating PIR
- Material Requirement Planning
- SAP SCM - Planned Order Creation
- Production Order Creation
- SAP SCM - Goods Issue
- Production Order Confirmation
- Production Order Cancellation
- SAP SCM - Integration
- SAP SCM - Integration Models
- SAP SCM - Master Data
- SAP SCM - Resources
- Production Data Structures
- Transfer Changed Master Data
- SAP SCM - Transfer Changed BOMs
- SAP SCM - Models and Versions
- SAP SCM - Applications
- Advanced Planning Optimization
- SAP SCM - Extended Warehouse
- Transportation Management
- Supply Network Collaboration
- Forecasting & Replenishment
- Consultant Responsibilities
- SAP SCM Useful Resources
- SAP SCM - Questions Answers
- SAP SCM - Quick Guide
- SAP SCM - Useful Resources
- SAP SCM - Discussion
SAP SCM Mock Test
This section presents you various set of Mock Tests related to SAP SCM. You can download these sample mock tests at your local machine and solve offline at your convenience. Every mock test is supplied with a mock test key to let you verify the final score and grade yourself.
SAP SCM Mock Test II
Q 1 - Quality is defined by the customer as?
A - an unrealistic definition of quality
B - a user based definition of quality
Answer : B
Q 2 - Which of the following module of PP is used to fill demand and supply gap?
Answer : B
Explanation
MRP run or planning run is an engine which is used to fill demand and supply gap.
Q 3 - Which of the following doesn’t represent an issue Material Requirement Planning element?
Answer : D
Explanation
Issues include PIRs, Dependent Requirements, Order Reservations, Sales Orders, Issuing Stock Transfer Orders, etc. and receipts include Production Orders, Purchase Requisitions, Purchase Orders, Open Production Orders, Receiving Stock Transfer Order, Schedule lines, etc.
Q 4 - After MRP run, which of the following gets created in Planning?
Answer : C
Answer : B
Explanation
NetChange in planning horizon −
This run considers the requirement in predefined planning horizon and not like net change which check the future requirements.
In this run, system consider only those material which has undergone some changes from their last MRP run.
Q 6 - Which of the following process includes generation of static report that contains planning run material wise and it displays time of MRP run at the top?
Answer : B
Explanation
MRP List is used to generate static report that contains planning run material wise and it displays time of MRP run at the top.
Q 7 - Which of the following transaction code is used to create Planned Independent Requirement PIR?
Answer : A
Explanation
Use T-code MD61 or go to Logistics → Production → Production Planning → Demand Management → Planned Independent Requirements → Create
Q 8 - When material is produced as per Production order and goods is placed at storage location, which of the following is correct?
A - Stock Quantity is increased and movement type is 103
B - Stock Quantity remain same and movement type is 103
Answer : C
Explanation
Good receipt is performed when material is produced as per Production order and goods is placed at storage location. The stock quantity is increased and movement type 101 is entered.
Q 11 - Which of the following is first step involved in Production Order confirmation?
Answer : B
Q 12 - In SAP SCM, which of the following master data is used to define sequence of activities performed at work center?
Answer : D
Explanation
Routing defines sequence of activities performed at work center. Routing plays in important role in calculating production cost, machine time and labor time.
Answer Sheet
Question Number | Answer Key |
---|---|
1 | B |
2 | B |
3 | D |
4 | C |
5 | B |
6 | B |
7 | A |
8 | C |
9 | C |
10 | A |
11 | B |
12 | D |