- SAP PP Tutorial
- SAP PP - Home
- SAP PP - Introduction
- SAP PP - Common Tables
- SAP PP - Organization Structure
- Integration with Other Modules
- SAP PP - Master Data
- SAP PP - Bill of Materials
- SAP PP - Work Center
- SAP PP - Routing
- SAP PP - Demand Management
- SAP PP - Creating PIR
- Material Requirement Planning
- SAP PP - MRP List
- SAP PP - Long Term Planning
- SAP PP - Production Orders
- SAP PP - Production Order Change
- Production Order Confirmation
- Canceling Production Order
- SAP PP - Capacity Planning
- SAP PP - Capacity Leveling
- SAP PP - Goods Receipt
- SAP PP - Stock Overview
- SAP PP - Goods Issue
- SAP PP - Goods Issue Reversal
- SAP PP - Lean Manufacturing
- SAP PP - Reports
- SAP PP - Material Document List
- Stock of Multiple Materials
- List in Bill of Material
- SAP PP Useful Resources
- SAP PP - Questions Answers
- SAP PP - Quick Guide
- SAP PP - Useful Resources
- SAP PP - Discussion
SAP PP Mock Test
This section presents you various set of Mock Tests related to SAP PP. You can download these sample mock tests at your local machine and solve offline at your convenience. Every mock test is supplied with a mock test key to let you verify the final score and grade yourself.
SAP PP Mock Test IV
Q 1 - When raw material is consumed to produce material as per Production order, to perform goods issue movement type is?
Answer : C
Explanation
In SAP PP, goods issue is done when raw material is consumed to produce material as per Production order. When goods are issued, system decreases the inventory of components at the storage location in Production Planning system.
Movement type 261 is used for goods issue.
Answer : A
Answer : B
Q 4 - Which of the following is correct about regenerative planning and net change planning?
A - Planning is performed online however in NETCH it is performed as background job.
B - Planning of material is as per demand, in other one it is based on previous productions.
Answer : C
Q 5 - Which of the following report is used to collect information about hierarchy of work center of a shift?
Answer : B
Q 6 - Material Requirement Planning can be performed at?
Answer : A
Q 7 - To see real time stock, you can use this report for multiple material?
Answer : B
Explanation
To see real time stock, you can use this report for multiple materials. When goods movement are done, you can use this report to see real time stock information.
Use T-Code: MB52
Q 8 - A Storage location is defined as location where materials are stored in plant?
Answer : A
Q 10 - Long term planning is almost similar to Material requirement planning in simulate version to predict the production plan as per future requirements?
Answer : A
Q 11 - To set your PIR version active, which of the below value should be used to specify requirement would be considered in material requirement planning?
Answer : A
Explanation
In SAP PP, demand management is performed by Planned Independent requirement PIR. Planned Independent requirement provides input for production planning. A PIR contains one planned quantity of product and one date for material or a planned quantity is split over a span of time period.
To set your PIR version active use value 00 to specify requirement would be considered in material requirement planning. To maintain number of versions of planned independent requirement, you can set some numbers to active and others to inactive.
Q 13 - Which of the following Transaction can be used confirm a Production Order and for Goods movement?
Answer : C
Explanation
To confirm Production Order, use T-code: CO15
You can perform following activities −
- Generate confirmation document
- Consume raw materials or semi-finished goods
- Good receipt of finished goods or semi-finished goods
Answer Sheet
Question Number | Answer Key |
---|---|
1 | C |
2 | A |
3 | B |
4 | C |
5 | B |
6 | A |
7 | B |
8 | A |
9 | C |
10 | A |
11 | A |
12 | A |
13 | C |